top of page
IMG_1801.JPG

ECO-FRIENDLY PIERS

We specialize in constructing all our piers in the shop, allowing us to efficiently load them onto the barge for installation with a crane after the pilings are set. Our engineered beams enable spans up t0 50 feet without the need for middle pilings or supports, promoting eco-friendliness by allowing natural sea flow and reducing debris while also providing a cost-effective solution.

​​​Quality-Driven Pier Construction: Eco-Friendly and Cost-Effective Solutions

  • All piers are constructed in-house for quality assurance.

  • Efficient loading onto the barge for crane installation after pilings are set.

  • Engineered beams span over 60 feet without middle pilings or supports.

  • Promotes eco-friendliness by allowing natural sea flow and reducing debris.

  • Cost-effective solutions for your construction needs

MARK ZACCADELLI

OCEAN'S EDGE

MARINE CONSTRUCTION

1392 Bristol Road, Bristol, ME  04539

Business: (207) 563-7880

Cell: (207) 380-1720

bottom of page